Adaptive Transportation Projects and Design Guidelines
These resources provide examples of physical adaptation projects in the transportation sector as well as other examples related to project design, such as design guidelines that incorporate climate change projections. Many of the examples in this list are provided by case studies developed through a cooperative agreement with the Federal Highway Administration. Apply additional filters to narrow the list by region, state, climate impacts, jurisdictional focus, or transportation lifecycle stage.
76 results are shown below.
Filter by States AffectedSelect states to filter this list
All
Alabama Alaska American Samoa Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida Georgia Guam Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New Hampshire New Jersey New Mexico New York North Carolina North Dakota Northern Marianas Islands Ohio Oklahoma Oregon Pennsylvania Puerto Rico Rhode Island South Carolina South Dakota Tennessee Texas Utah Vermont Virgin Islands Virginia Washington West Virginia Wisconsin Wyoming
Resource
December 2013
From the Georgetown Climate Center, this case study examines the challenges encountered by Vermont localities in trying to use federal disaster relief funds to rebuild their transportation system to be more resilient to future impacts in the aftermath of Hurricane Irene.
Authors or Affiliated Users: Justin Clancy, Jessica Grannis
Resource Category: Law and Governance
See Resource Login to Add to My Resource List
Resource
December 2013
Vermont experienced significant barriers to using disaster relief funding to install larger culverts after Tropical Storm Irene. The storm caused massive damage to the state’s transportation infrastructure and warranted a presidential disaster declaration. In the aftermath of the event, the Vermont Transportation agency (VTrans) and localities followed state regulations that required the installation of larger culverts to address increased stream flow and to allow for fish passage. Localities, however, were denied reimbursement for these “improvements” by the Federal Emergency Management Agency (FEMA), the agency that administers disaster relief funding for rebuilding local roads and bridges.
Resource Category: Law and Governance
See Resource Login to Add to My Resource List
Resource
2013
The Plumb Beach Renourishment Project involved the placement of sand on the beach to protect the Belt Parkway in Brooklyn, NY. The project, which is managed by the U. S. Army Corps of Engineers (Corps), is ongoing and is being implemented in two phases. In Phase I, the Corps nourished the beach with dredged sand and installed several geotube groins (sand bags) to prevent short-term erosion of the newly-deposited sand. Phase I was completed days before hurricane Sandy devastated the Northeast region.
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
November 2013
The UK Government's proposed design for a new high speed railway between London and points north considered climate change-related risks, including flooding of tracks and overheating in tunnels. The risk assessment report discusses how those risks will be addressed in the proposed design for the project. The proposed project, High Speed Two (HS2), is designed to link eight of Britain’s ten largest cities and increase the capacity of the country’s rail infrastructure. The project is expected to cost 16 billion British pounds, with service to start in 2026.
Resource Category: Assessments
See Resource Login to Add to My Resource List
Resource
November 2013
The Minnesota Department of Transportation (MnDOT) implemented several different solutions to address damage to Minnesota Highway 210 near Jay Cooke State Park to improve the future resilience of the highway. Measures include custom culvert design, soil stabilization, and replacing culverts with bridges. Multiple sections of Highway 210 remain closed while MnDOT conducts damage assessments and develops long-term plans.
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
November 2013
The City of Seattle (City), through its Department of Transportation (SDOT), began a project to replace an aging seawall in Elliott Bay that protects and supports critical transportation infrastructure from coastal storms and shoreline erosion. The original seawall was built between 1916 and 1934 atop timber piles and is at risk of failure in the event of an earthquake due to years of deterioration of the timber caused by waves and tidal forces. The updated seawall will have a minimum 75-year lifespan, provide protection for critical infrastructure (taking sea-level rise into consideration), meet current seismic standards, and improve natural habitat and salmon migration pathways.
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
October 2013
The Boston Architectural College (BAC) installed a green alley demonstration project on its campus located in the Back Bay area of Boston along the Charles River. The green alley used permeable pavement to allow stormwater to percolate through the road bed to recharge groundwater and filter pollutants. The project was designed to be replicable and to help with public education on the benefits and design of green infrastructure. The purpose of the green alley is to reduce polluted runoff by filtering and redirecting rainfall to the groundwater table.
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
October 2013
California’s Climate Action Team (CAT) developed the guidance document, Preparing California for Extreme Heat: Guidance and Recommendations, to provide California agencies with best practices for adapting to heat-related climate change impacts. Several of the recommendations focus on adaptations to the transportation sector and make recommendations for actions that can be taken by the California Department of Transportation (Caltrans) to increase heat resilience. Transportation improvements, such as road pavement and the removal of vegetation, can contribute to higher temperatures in urban areas resulting in what are often referred to as urban heat islands.
Author or Affiliated User: Michael McCormick
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
National Park Service (NPS) managers at Assateague Island National Seashore (AINS) have developed a plan to adapt roadways and parking areas to excessive erosion and overwashing from storm surges. This plan is in progress, and this case study will be updated accordingly. Two parking lots will be relocated away from the shoreline to reduce their vulnerability to erosion from future storms and help restore natural coastal processes. Additionally, they will be reconstructed from materials that are readily available on Assateague Island, such as clay and crushed clam shell, which will help reduce water flow rates over the parking lots and corresponding risk of erosion.
Resource Category: Solutions
See Resource Login to Add to My Resource List
Resource
July 2013
The Chicago Department of Transportation (CDOT) issued these guidelines (“Guidelines”) to require the implementation of sustainability best practices (environmental and social) into all transportation infrastructure projects, with metrics to ensure that projects are designed to be resilient to the long-term impacts of climate change. The Guidelines include two components: Volume I outlines the city’s sustainability goals and the process for integrating those goals into urban infrastructure design, construction, and maintenance; Volume 2 provides specific strategies, references, and resources to help project managers and engineers incorporate sustainability principles into specific projects.
Resource Category: Law and Governance
See Resource Login to Add to My Resource List